The boat has 3 beds in 2 quarters. 1 bed is the sofa, where the table can come down to make a frame.
We don’t need that many beds, What we do need is a wardrobe. Smaller one anyways.
So we tossed out a bed. Then work began.
Part railing system installed (no photos), and on top of that we wanted a set of shelves. We measured out the things early on, and know precisely what we had to work with. The floor, however, needed some love.
The shelving system we settled on is made out of bamboo. A throwback to when we were living in Japan.

So here’s flooring being added. One of the downsides is that the flooring has hatches, whatnot, to access the sewage and piping system, and they can’t be messed with.

Layed out. What’s left is dremmeling the edges to make it all smooth and nice.

It’ll be sweet. Temporary putting it all together.

With some mats and such this will be our little loadup-loadout area. Awwwh yis.

